ATAGalleryConstructionRita - Queen of Speed › March 22nd 2005
ritacon050322_01.jpg
Train 1, without the front of the car attached, sits in the brake run, whilst Train 2 is in the maintenance garage.
ritacon050322_02.jpg
Looking across at the loading bays from a staff area.
ritacon050322_03.jpg
Train 1 gets read for a launch.
ritacon050322_04.jpg
Train 2, in the onload section with the restraints open.
ritacon050322_05.jpg
A portable starter for industrial trucks and vehicles is used on the back of Train 2.
ritacon050322_06.jpg
A corkscrew train heads into the second corkscrew during testing.
ritacon050322_07.jpg
The front of Train 1, lying on the exit platform.
ritacon050322_08.jpg
The point where the main queue line and the SRQ join the loading platform. Note the lockers on the right of the photo.
ritacon050322_09.jpg
Work continues into the evening to try and get the ride ready.
     
9 images on 1 page(s)