The lift hill is just about done now.
aircon010921_02.jpg
The initial drop and first turn around are now in place.
aircon010921_03.jpg
Here the track banks steeply into the trees.
aircon010921_04.jpg
And the track changes colour before it drops underneath the monorail.
aircon010921_05.jpg
And back out the other side.
aircon010921_06.jpg
And up into the first inversion, seen from the opposite side of the site.
aircon010921_07.jpg
The first inversion is now almost complete.
aircon010921_08.jpg
A closer look at the inversion.
aircon010921_09.jpg
The inversion dominates the skyline in Forbidden Valley
aircon010921_10.jpg
Further track waiting to be installed.
aircon010921_11.jpg
Compare the track size to Mac.
aircon010921_12.jpg
The lower chassis of Dino Dancer is now located in the picnic area of Forbidden Valley.