aircon010928_01.jpg
All of the track up to the entry to the second tunnel is now in place.
aircon010928_02.jpg
The station roof/shop floor has now been poured too. Building will progress here over the next few weeks.
aircon010928_03.jpg
A closer shot of the track as it races up the hill. It goes quite high. You will be lying on your back here.
aircon010928_04.jpg
Another inversion takes you back into the flying position before you enter the second tunnel.