ATAGalleryConstructionAir › September 1st 2001
aircon010901_01.jpg
Supports have now appeared in the main car park, close to where the Air lift hill is being built.
aircon010901_02.jpg
More steel for the lift hill/first drop.
aircon010901_03.jpg
What is this? We have no idea...
aircon010901_04.jpg
More supports on the grass, shows how well the supports will blend in with the surroundings.
aircon010901_05.jpg
A few more bits of steel.
aircon010901_06.jpg
The construction crew are now preparing to install the supports for the lift hill and first drop.
aircon010901_07.jpg
A curved track section ready to be installed.
aircon010901_08.jpg
Some small supports in the lower car park.
aircon010901_09.jpg
The concrete roof of the first tunnel is now being placed, suggesting that track has been placed. Lift hill motors are also being installed.
aircon010901_10.jpg
A view across the top of the tunnel towards the station.
aircon010901_11.jpg
In the background, part of the track which includes the switching mechanism for the dual station.
aircon010901_12.jpg
One of the first pieces of lift hill supports is now installed and ready.
aircon010901_13.jpg
The crane is being used to install the tunnel track pieces, and the roof for the tunnel itself.
aircon010901_14.jpg
A close up of the front of the station shows where the two station tracks meet.
   