
No visible changes to the front of the building yet.
|
|

There is plenty of work going on inside, however, to modify the existing water channel.
|
|

A digger outside the entrance. You can still see part of the old theming inside the building.
|
|

Even more scaffolding has been erected on the outside of the building now.
|
|

The deep trenches in the ground outside.
|
|

Floodlights are required, with the light fading so early now.
|
|

As darkness falls, construction workers continue to do their job.
|
|

Hopefully we will begin to see some major changes in the area soon.
|
|

The "Dolly Mixtures" in storage.
|
|
|
|
|
|