Please note that Alton Towers Almanac is no longer maintained or updated, and almost all information will be out of date.

For the latest information, please visit Alton Towers’ official website.

ATAGalleryConstructionCharlie and the Chocolate Factory › April 1st 2006
Opening Day
ccfcon060401_01.jpg
The park has just opened, but already some very keen enthusiasts have entered the queue line waiting for the ride's opening.
ccfcon060401_02.jpg
The queue line fills up some more, as we take alook at the detail on the exterior.
ccfcon060401_03.jpg
By lunchtime, the queue extended all the way back to the Sky Ride station!
ccfcon060401_04.jpg
The press were on hand to cover the ride's opening, with footage being shot inside the ride just before the ride opened.
ccfcon060401_05.jpg
By around 1pm the ride had opened its doors, but the queue line was just as big as only one elevator was working at this point.
ccfcon060401_06.jpg
The queue line, as it nears the entrance to the building.
ccfcon060401_07.jpg
This is the point where you go inside and see the preshow.
ccfcon060401_08.jpg
A very enthusiastic staff member, dressed up for the occasion.
ccfcon060401_09.JPG
The ride's closing was due to be 5:30pm with the rest of the park, but it was extended to 6:50pm to allow all guests to get a ride.
     
9 images on 1 page(s)
Spacer