ATAGalleryConstructionCharlie and the Chocolate Factory › October 13th 2005
ccfcon051013_01.jpg
Lots of Toyland teddies sitting in storage.
ccfcon051013_02.jpg
The area in front of Toyland Tours. It looks quite different now that the floor has been removed!
ccfcon051013_03.jpg
Looking from the old entrance to Toyland, towards McDonalds and where the extension will go.
ccfcon051013_04.jpg
Inside the station, looking at where the old queue line would lead guests inside.
ccfcon051013_05.jpg
The SS Toyland Tours wheel, still unchanged.
ccfcon051013_06.JPG
Theming to the side of it has been removed, however.
ccfcon051013_07.jpg
Parts of the station are looking very bare now.
ccfcon051013_08.jpg
The first turn of the ride, now unrecognisable.
ccfcon051013_09.jpg
Looking back down the station shows just how much has changed.
ccfcon051013_10.jpg
This is where the Bouncy Castles, Ball Striping, Chubby Checker, Teddy Stuffing and Dolly Mixtures used to be.
ccfcon051013_11.jpg
From where you used to enter the Bathtime section, looking back.
ccfcon051013_12.jpg
This is the Party Room. The water channel has now been partially demolished to allow it to be re-routed.
ccfcon051013_13.jpg
Here's the other end - looking back towards where the Sonic area used to be.
ccfcon051013_14.jpg
A closer look at where the channel has been removed.
ccfcon051013_15.jpg
Vehicles that were used to do the channel work sit inside the building.
 
15 images on 1 page(s)