ATAGalleryConstructionPeugeot Driving School › May 28th 2006
drivingcon060528_01.jpg
More work has been done in the area next to the archway that joins Fountain Square to Cred Street.
drivingcon060528_02.jpg
Not much activity on-site today: the contractors are usually only brought in on weekdays.
drivingcon060528_03.jpg
A lone workman touches up the front of what will become the "car showroom" building.
drivingcon060528_04.jpg
Inside, little has changed in the last few weeks.
drivingcon060528_05.jpg
The showroom interior is looking a lot tidier now, though.
drivingcon060528_06.jpg
You can see that more kerbs have been put in place, outlining the circuit.
drivingcon060528_07.jpg
The steamroller sits motionless on the far side of the construction site.
drivingcon060528_08.jpg
Around the back, we take a closer look at the newer parts of the circuit.
drivingcon060528_09.jpg
This section of tarmac was poured several weeks ago.
drivingcon060528_10.jpg
No theming has yet been added to this island.
drivingcon060528_11.jpg
It's very likely that these trees will stay in place, hence the barriers.
drivingcon060528_12.jpg
A close look to where the road heads into the "tunnel", formerly the gingerbread house. The arch on the right has been heightened to match the door on the left.
drivingcon060528_13.jpg
Looking across the site. There's evidently lots of work still to do.
drivingcon060528_14.jpg
More tarmac has been poured, as you can see to the right of this photo.
   
14 images on 1 page(s)