Many thanks to John Wardley for letting us use these photos. |
![Filename=aircon020125_01.jpg
Filesize=187KB
Dimensions=1024x768
Date added=Jun 17, 2006 aircon020125_01.jpg](albums/construction/air/photos/02-01%20January/25/thumb_aircon020125_01.jpg)
Some more landscaping work has been done, and the queue line bridge over the brake run has been erected.
|
|
![Filename=aircon020125_02.jpg
Filesize=169KB
Dimensions=1024x768
Date added=Jun 17, 2006 aircon020125_02.jpg](albums/construction/air/photos/02-01%20January/25/thumb_aircon020125_02.jpg)
The shop structure above the station is now largely complete.
|
|
![Filename=aircon020125_03.jpg
Filesize=193KB
Dimensions=1024x768
Date added=Jun 17, 2006 aircon020125_03.jpg](albums/construction/air/photos/02-01%20January/25/thumb_aircon020125_03.jpg)
Looking down the brake run, past the maintenance garage on the left.
|
|
![Filename=aircon020125_04.jpg
Filesize=165KB
Dimensions=1024x768
Date added=Jun 17, 2006 aircon020125_04.jpg](albums/construction/air/photos/02-01%20January/25/thumb_aircon020125_04.jpg)
More landscaping has been carried out around the first drop area.
|
|
![Filename=aircon020125_05.jpg
Filesize=163KB
Dimensions=1024x768
Date added=Jun 17, 2006 aircon020125_05.jpg](albums/construction/air/photos/02-01%20January/25/thumb_aircon020125_05.jpg)
The view from the platform next to the shop.
|
|
|
|
|
|