ATAGalleryConstructionAir › January 25th 2002
Many thanks to John Wardley for letting us use these photos.
aircon020125_01.jpg
Some more landscaping work has been done, and the queue line bridge over the brake run has been erected.
aircon020125_02.jpg
The shop structure above the station is now largely complete.
aircon020125_03.jpg
Looking down the brake run, past the maintenance garage on the left.
aircon020125_04.jpg
More landscaping has been carried out around the first drop area.
aircon020125_05.jpg
The view from the platform next to the shop.
     
5 images on 1 page(s)
Spacer