ATAGalleryConstructionPeugeot Driving School › July 8th 2006
drivingcon060708_01.jpg
The area is looking even closer to completion now.
drivingcon060708_02.jpg
These three models have been delivered: a zebra, some hedgehogs, and the Lollipop Lady. Comparing this photo with this concept art shows how closely they resemble the initial drawings.
drivingcon060708_03.jpg
A close-up on the zebra.
drivingcon060708_04.jpg
And a look at the hedgehogs.
drivingcon060708_05.jpg
The bendy traffic cones we saw on June 16th are now on-site.
drivingcon060708_06.jpg
Another look at the cones.
drivingcon060708_07.jpg
Looking inside the briefing room, you can just about make out a sign on the wall saying "No Bumping".
drivingcon060708_08.jpg
Painting of the bridge has begun.
drivingcon060708_09.jpg
The sides and the handrail are brown, while the steps themselves have not yet been painted or otherwise covered.
drivingcon060708_10.jpg
The view you'll get coming from Fountain Square and heading over the bridge into the rest of Cred Street.
drivingcon060708_11.jpg
A look from the opposite side of the construction site.
drivingcon060708_12.jpg
Road markings now totally cover the circuit.
drivingcon060708_13.jpg
The Car Wash building, aka the old Gingerbread House, now has signage up. No further work has yet been done to the CrowNav.
drivingcon060708_14.jpg
The Bubble Wash has more kerbing around it now, and the signage has been decorated further.
drivingcon060708_15.jpg
A look at this side of the construction site.
drivingcon060708_16.jpg
The signs that were previously on the fence around the site have now reappeared on the wall near the Bubble Wash.
16 images on 1 page(s)
Spacer