
The area is looking even closer to completion now.
|
|

These three models have been delivered: a zebra, some hedgehogs, and the Lollipop Lady. Comparing this photo with this concept art shows how closely they resemble the initial drawings.
|
|

A close-up on the zebra.
|
|

And a look at the hedgehogs.
|
|

The bendy traffic cones we saw on June 16th are now on-site.
|
|

Another look at the cones.
|
|

Looking inside the briefing room, you can just about make out a sign on the wall saying "No Bumping".
|
|

Painting of the bridge has begun.
|
|

The sides and the handrail are brown, while the steps themselves have not yet been painted or otherwise covered.
|
|

The view you'll get coming from Fountain Square and heading over the bridge into the rest of Cred Street.
|
|

A look from the opposite side of the construction site.
|
|

Road markings now totally cover the circuit.
|
|

The Car Wash building, aka the old Gingerbread House, now has signage up. No further work has yet been done to the CrowNav.
|
|

The Bubble Wash has more kerbing around it now, and the signage has been decorated further.
|
|

A look at this side of the construction site.
|
|

The signs that were previously on the fence around the site have now reappeared on the wall near the Bubble Wash.
|
|
|