These conceptual drawings/3D models were created in mid-2001, for theming Air. They were all eventually dropped for budgetary reasons. |
The proposed tunnel decoration, which integrated the Cadbury's Heroes sponsorship.
|
|
The build up to the "take off", with lights and decoration that did not appear on the finished ride.
|
|
One of several water features that never appeared. This waterfall and rock pool feature was also to have the Cadbury's Heroes logo.
|
|
These water geysers would have been positioned around where the on-ride photo currently is - just after the first drop underneath the Monorail.
|
|
The waterfall that was to be positioned just after the mid-ride tunnel, from the perspective of the queue line leading into the right-hand station.
|
|
The "gushers" that would've fed the waterfall shown in the previous image.
|
|
|
|
|