Please note that Alton Towers Almanac is no longer maintained or updated, and almost all information will be out of date.

For the latest information, please visit Alton Towers’ official website.

Last additions
aircon010716_02.jpg
A distinct level change is now apparent in the station area in this close-up.Aug 27, 2005
aircon010716_01.jpg
Little seems to have changed to most of the site, but a little more concrete has been poured in the station area.Aug 27, 2005
aircon010630_05.jpg
The large seperate section of the tunnel waiting for coaster machinery and electronics.Aug 27, 2005
aircon010630_04.jpg
It appears that the lift hill tunnel now is just awaiting steel.Aug 27, 2005
aircon010630_03.jpg
An overall view of the lift hill tunnel shows that soil has been used to fill in the edges of the concrete, and work can be seen going on in the loading station.Aug 27, 2005
aircon010630_02.jpg
In the loading station area, concrete is now appearing. Note how the middle section seems to be seperated away. Perhaps a different level of concrete in the middle of the station for machinery or perhaps theming.Aug 27, 2005
aircon010630_01.jpg
No further work seems to have taken place on the entrance to the lift hill tunnel section, although work is now going on in the station area.Aug 27, 2005
aircon010613_02.jpg
Tunnel work must now be almost complete, with soil now being placed into the sides to fill in the gaps between walls and ground.Aug 27, 2005
aircon010613_01.jpg
The iron work for another footer, waiting to be placed, and concreted into the ground.Aug 27, 2005
aircon010610_03.jpg
Work on the first tunnel looks almost complete.Aug 27, 2005
aircon010610_01.jpg
Another view of the entrance to the first tunnel, and most of the concrete has now been poured.Aug 27, 2005
aircon010610_02.jpg
Enormous support footers are now all over the site. Expect these footers to be covered by theming by opening day next year.Aug 27, 2005
aircon010512_05.jpg
Plenty of wood and steel lying in the area reserved for the loading station, waiting to be bolted together into scaffold.Aug 26, 2005
aircon010512_04.jpg
Zooming in towards where the second tunnel's exit is expected to be.Aug 26, 2005
aircon010512_03.jpg
Looking across the site towards where the second tunnel will soon appear.Aug 26, 2005
aircon010512_02.jpg
Here is where the station is expected to join onto the first tunnel. Notice that so far, concrete has only been poured to half the height of the tunnel, with the iron work still showing above it.Aug 26, 2005
aircon010512_01.jpg
Track support footers are now appearing in the woods above Nemesis, showing that the new coaster will cross Nemesis at least once. Aug 26, 2005
aircon010507_04.jpg
Looking back towards the station area, shows little change from last month.Aug 26, 2005
aircon010507_03.jpg
A similar shot from the ground shows the complexity of the iron work.Aug 26, 2005
aircon010507_01.jpg
A view of the back of the site from the monorail.Aug 26, 2005
aircon010507_02.jpg
A shot of the tunnel construction from above, shows much iron work, ready for concrete pouring.Aug 26, 2005
aircon010403_05.jpg
Looking down the length of the site, here is where the loading and unloading station will be built. It is generally accepted that there will be two loading/unloading stations, to allows a higher throughput of passengers.Aug 26, 2005
aircon010403_04.jpg
Many of the footers for the track supports have already been constructed, such as this one close to the Nemesis track. Many more have also been constructed, or are in the process of being constructed in the woods above Nemesis.Aug 26, 2005
aircon010403_03.jpg
The tunnel appears to have been blasted, and dug out. Iron work will then be constructed, and further concrete then poured into the moulds along with the iron work.Aug 26, 2005
aircon010403_01.jpg
In comparison to Oblivion, Air (SW5) is getting much more publicity. This large banner was fastened to the fence that surrounds the site at the beginning of the season, but now is at the top of Towers Street.Aug 26, 2005
aircon010403_02.jpg
The exit of the first tunnel, and what will become the lift hill. Notice how close the track will be going to the Monorail track. A little concrete has already been poured at this early stage in construction.Aug 26, 2005
ccfcon050826_05.jpg
An overall look at the fence. There is an identical "themed" section on the other side, facing Tweenies Theatre & Bouncing Bugs.Aug 26, 2005
ccfcon050826_04.jpg
A look at the right hand side. Enthusiasts will be happy that the fence isn't as dull as it first looked like it would be.Aug 26, 2005
ccfcon050826_03.jpg
A look at the illustrations on the left hand side of the fence.Aug 26, 2005
ccfcon050826_02.jpg
The illustrations are in the same style as, or possibly even designed by, the man who did the illustrations for the books, Quentin Blake. This backs up the info that the ride will be based on the book rather than either of the films.Aug 26, 2005
ccfcon050826_01.jpg
The fence that appeared around Toyland Tours a few days ago is now themed.Aug 26, 2005
2003map_main.jpg
Aug 25, 2005
2005map_main.jpg
Aug 25, 2005
2005map_front.jpg
Aug 25, 2005
fireworks2004_22.jpg
Aug 25, 2005
fireworks2004_20.jpg
Aug 25, 2005
fireworks2004_21.jpg
Aug 25, 2005
fireworks2004_19.jpg
Aug 25, 2005
fireworks2004_18.jpg
Aug 25, 2005
fireworks2004_17.jpg
Aug 25, 2005
fireworks2004_16.jpg
Aug 25, 2005
fireworks2004_15.jpg
Aug 25, 2005
fireworks2004_14.jpg
Aug 25, 2005
fireworks2004_13.jpg
Aug 25, 2005
fireworks2004_12.jpg
Aug 25, 2005
fireworks2004_11.jpg
Aug 25, 2005
fireworks2004_10.jpg
Aug 25, 2005
fireworks2004_09.jpg
Aug 25, 2005
fireworks2004_08.jpg
Aug 25, 2005
fireworks2004_07.jpg
Aug 25, 2005
fireworks2004_05.jpg
Aug 25, 2005
fireworks2004_06.jpg
Aug 25, 2005
fireworks2004_04.jpg
Aug 25, 2005
fireworks2004_03.jpg
Aug 25, 2005
fireworks2004_02.jpg
Aug 25, 2005
fireworks2004_01.jpg
Aug 25, 2005
rowingboats01.jpg
Aug 25, 2005
newbeast01.jpg
In the queue line for the New Beast.Aug 25, 2005
aerial05.jpg
This fantastic aerial photo was taken on 23rd March 2005.Aug 25, 2005
nemaerial.jpg
Taken at the beginning of 1996, this shot shows Nemesis, now almost two years old, dominating the landscape in Forbidden Valley. Also shown is Thunder Looper, with 1996 being its final year in the park. Look closely, and you'll see that Thunder Looper was actually in action when this picture was taken.Aug 25, 2005
1001nights01.jpg
1001 Nights in full swing.Aug 25, 2005
26.jpg
Aug 25, 2005
25.jpg
Aug 25, 2005
24.jpg
Aug 25, 2005
23.jpg
Aug 25, 2005
22.jpg
Aug 25, 2005
21.jpg
Aug 25, 2005
20.jpg
Aug 25, 2005
19.jpg
Aug 25, 2005
18.jpg
Aug 25, 2005
17.jpg
Aug 25, 2005
14.jpg
Aug 25, 2005
16.jpg
Aug 25, 2005
15.jpg
Aug 25, 2005
13.jpg
Aug 25, 2005
12.jpg
Aug 25, 2005
11.jpg
Aug 25, 2005
10.jpg
Aug 25, 2005
09.jpg
Aug 25, 2005
08.jpg
Aug 25, 2005
07.jpg
Aug 25, 2005
06.jpg
Aug 25, 2005
05.jpg
Aug 25, 2005
03.jpg
Aug 25, 2005
04.jpg
Aug 25, 2005
02.jpg
Aug 25, 2005
01.jpg
Aug 25, 2005
07.jpg
Visitors could have their photo taken with Fred, Daphne, Scooby, Shaggy and Velma.Aug 25, 2005
06.jpg
At the end of day parade, the Scooby Gang appeared!Aug 25, 2005
05.jpg
For most of the day, there was little or no activity around the van.Aug 25, 2005
04.jpg
Now that is attention to detail!Aug 25, 2005
03.jpg
Looking at the van from the front.Aug 25, 2005
02.jpg
A close-up of the side of the van.Aug 25, 2005
01.jpg
The Mystery Machine, situated in Towers Street.Aug 25, 2005
07.jpg
The dancers dress in different costumes to represent each area - here you can see some Katanga Canyon performers.Aug 25, 2005
06.jpg
Staff members doing choreographed dancing at the top of the street.Aug 25, 2005
05.jpg
Like the Tweenies, you could have your photo taken with Henry Hound.Aug 25, 2005
04.jpg
After a long absence, Henry Hound is finally back at the Towers!Aug 25, 2005
02.jpg
The Tweenies arrive to meet the guests.Aug 25, 2005
03.jpg
Kids could have their photograph taken with their favourite Tweenies character.Aug 25, 2005
01.jpg
Preparations at the top of Towers Street.Aug 25, 2005
thunderlooper2.jpg
This is the view that greeted you when entering the Forbidden Valley (called Thunder Valley back then) in 1993.Aug 25, 2005
thunderlooper1.jpg
Thunder Looper in action in 1993.Aug 25, 2005
ccfcon050824_03.jpg
The fence almost looks as if it's been put the wrong way round!Aug 24, 2005
ccfcon050824_04.jpg
From here, you can see that the fence stretches around to McDonald's, to stop people getting through that way.Aug 24, 2005
ccfcon050824_01.jpg
This fence around Toyland Tours has appeared recently, as seen from next to Bouncing Bugs.Aug 24, 2005
ccfcon050824_02.jpg
The fence started to go up yesterday, and was completed this morning.Aug 24, 2005
DSC01782.JPG
Aug 16, 2005
DSC01783.JPG
Aug 16, 2005
Dsc01512.jpg
Aug 04, 2005
Dsc01510.jpg
Aug 04, 2005
DSC01511.JPG
Aug 04, 2005
Dsc01202.jpg
Aug 04, 2005
agm4.jpg
Aug 04, 2005
agm01.jpg
Aug 04, 2005
agm2.jpg
Aug 04, 2005
agm6.jpg
Aug 04, 2005
dansbirthday18.jpg
Aug 04, 2005
ww22.jpg
Looking down some Rita track, ready to be installed, toward the entrance to Cred Street.Aug 04, 2005
DSC01218.JPG
Aug 01, 2005
DSC01254.JPG
Aug 01, 2005
DSC01160.JPG
Aug 01, 2005
DSC01106.JPG
Frog FountainsAug 01, 2005
ritablur.jpg
Aug 01, 2005
DSC01183.JPG
Aug 01, 2005
     
4925 images on 25 page(s) Spacer Spacer Spacer Spacer Spacer 25
Spacer