Please note that Alton Towers Almanac is no longer maintained or updated, and almost all information will be out of date.

For the latest information, please visit Alton Towers’ official website.

Last additions
y_blackhole06.jpg
July 8th 2006You can see that the track is still inside the tent, although a lot of walls and equipment seem to have been removed.Jul 10, 2006
y_blackhole05.jpg
July 8th 2006A closer look at the end section.Jul 10, 2006
y_blackhole04.jpg
July 8th 2006Viewing the tent from Enterprise's queue line. You can see that the tent has been opened up.Jul 10, 2006
y_blackhole03.jpg
July 8th 2006A sign on the fence.Jul 10, 2006
y_blackhole02.jpg
July 8th 2006The fence goes around past the exit of Oblivion's tunnel.Jul 10, 2006
y_blackhole01.jpg
July 8th 2006A large fence now surrounds the Black Hole prior to its removal.Jul 10, 2006
drivingcon060708_16.jpg
The signs that were previously on the fence around the site have now reappeared on the wall near the Bubble Wash.Jul 09, 2006
drivingcon060708_15.jpg
A look at this side of the construction site.Jul 09, 2006
drivingcon060708_13.jpg
The Car Wash building, aka the old Gingerbread House, now has signage up. No further work has yet been done to the CrowNav.Jul 09, 2006
drivingcon060708_14.jpg
The Bubble Wash has more kerbing around it now, and the signage has been decorated further.Jul 09, 2006
drivingcon060708_11.jpg
A look from the opposite side of the construction site.Jul 09, 2006
drivingcon060708_12.jpg
Road markings now totally cover the circuit.Jul 09, 2006
drivingcon060708_10.jpg
The view you'll get coming from Fountain Square and heading over the bridge into the rest of Cred Street.Jul 09, 2006
drivingcon060708_09.jpg
The sides and the handrail are brown, while the steps themselves have not yet been painted or otherwise covered.Jul 09, 2006
drivingcon060708_08.jpg
Painting of the bridge has begun.Jul 09, 2006
drivingcon060708_07.jpg
Looking inside the briefing room, you can just about make out a sign on the wall saying "No Bumping".Jul 09, 2006
drivingcon060708_06.jpg
Another look at the cones.Jul 09, 2006
drivingcon060708_05.jpg
The bendy traffic cones we saw on June 16th are now on-site.Jul 09, 2006
drivingcon060708_04.jpg
And a look at the hedgehogs.Jul 09, 2006
drivingcon060708_03.jpg
A close-up on the zebra.Jul 09, 2006
drivingcon060708_01.jpg
The area is looking even closer to completion now.Jul 09, 2006
drivingcon060708_02.jpg
These three models have been delivered: a zebra, some hedgehogs, and the Lollipop Lady. Comparing this photo with this concept art shows how closely they resemble the initial drawings.Jul 09, 2006
06bucketandspade_06.jpg
A large banner advertises the event to guests in the theme park.Jul 09, 2006
06bucketandspade_05.jpg
The view from the 'beach'. The lake at the back of the hotel fills the role of the 'sea'.Jul 09, 2006
06bucketandspade_04.jpg
Buckets and spades are littered around the sandpit.Jul 09, 2006
06bucketandspade_03.jpg
A British guest enjoys the Great British sunshine on a Great British deck chair.Jul 09, 2006
06bucketandspade_02.jpg
A sign on the edge of the sandpit.Jul 09, 2006
06bucketandspade_01.jpg
The mini-beach for hotel guests is at the back of the Alton Towers Hotel.Jul 09, 2006
worldcup2006_04.jpg
Inside Ma Garrita's bar at the Splash Landings hotel, there are... you guessed it... more flags.Jul 08, 2006
worldcup2006_03.jpg
Yet more flags are all around Towers Street.Jul 08, 2006
nemesis_06070801.jpg
Jul 08, 2006
towersstreet02.jpg
Jul 02, 2006
air14.jpg
Jul 02, 2006
aaa_charlie_01.jpg
The control panel at the boat offload (Shrinking Room) part of Charlie.Jul 02, 2006
drivingcon060701_11.jpg
Mirroring similar shots taken in the last few months, here's another look at the construction site from the top of the Towers.Jul 02, 2006
drivingcon060701_10.jpg
A close-up on the incomplete CrowNav.Jul 02, 2006
drivingcon060701_09.jpg
Next to the CrowNav, you can see what will be a "foam wash".Jul 02, 2006
drivingcon060701_08.jpg
Looking over to the old Gingerbread house, you can see the "CrowNav" under construction.Jul 02, 2006
drivingcon060701_07.jpg
Another look at the direction signs.Jul 02, 2006
drivingcon060701_06.jpg
A closer look at the sign at the far end of the site, and the bubble wash.Jul 02, 2006
drivingcon060701_05.jpg
Inside what used to be the Sweet Shop, you can see the decor includes more signs. This is likely to be where kids will get their briefing before heading out onto the circuit.Jul 02, 2006
drivingcon060701_04.jpg
Speed limit signs next to the bubble wash, which has a tortoise motif on it.Jul 02, 2006
drivingcon060701_03.jpg
The bridge connecting the lower end of Cred Street with Fountain Square is now complete. Note also the pole which will be part of the zebra crossing.Jul 02, 2006
drivingcon060701_02.jpg
Traffic lights have appeared all around the circuit.Jul 02, 2006
drivingcon060701_01.jpg
More progress has been made since our last update.Jul 02, 2006
nemesis_comic_34.jpg
Page 34Jun 30, 2006
nemesis_comic_32-33.jpg
Pages 32 and 33Jun 30, 2006
nemesis_comic_30-31.jpg
Pages 30 and 31Jun 30, 2006
nemesis_comic_28-29.jpg
Pages 28 and 29Jun 30, 2006
nemesis_comic_26-27.jpg
Pages 26 and 27Jun 30, 2006
nemesis_comic_24-25.jpg
Pages 24 and 25Jun 30, 2006
nemesis_comic_22-23.jpg
Pages 22 and 23Jun 30, 2006
nemesis_comic_20-21.jpg
Pages 20 and 21Jun 30, 2006
nemesis_comic_18-19.jpg
Pages 18 and 19Jun 30, 2006
nemesis_comic_17.jpg
Page 17Jun 30, 2006
nemesis_comic_12-13.jpg
Pages 12 and 13Jun 30, 2006
nemesis_comic_15.jpg
Page 15Jun 30, 2006
nemesis_comic_08-09.jpg
Pages 8 and 9Jun 30, 2006
nemesis_comic_10-11.jpg
Pages 10 and 11Jun 30, 2006
nemesis_comic_04-05.jpg
Pages 4 and 5Jun 30, 2006
nemesis_comic_06-07.jpg
Pages 6 and 7Jun 30, 2006
nemesis_comic_01-front.jpg
Front CoverJun 30, 2006
nemesis_comic_03.jpg
Page 3Jun 30, 2006
drivingcon060617_07.jpg
And here's the other side. The bridge will probably double up nicely as a viewing platform for parents watching their children enjoy the ride.Jun 20, 2006
drivingcon060617_06.jpg
A closer look at the steps on one side of the incomplete bridge.Jun 20, 2006
drivingcon060617_05.jpg
A bridge is being constructed to allow guests to get from Fountain Square into Cred Street through the archway, rather than having to go the long way around.Jun 20, 2006
drivingcon060617_04.jpg
A closer look at the structure which covers a small part of the circuit.Jun 20, 2006
drivingcon060617_03.jpg
The metal frame has now been covered - speculation suggests this could be the car wash section.Jun 20, 2006
drivingcon060617_02.jpg
A new speaker has been attached to the wall of the old Sweet Shop, presumably for the attraction's soundtrack, or maybe for sound effects as kids drive around.Jun 20, 2006
drivingcon060617_01.jpg
With the proposed opening date of July 17th only 4 weeks away, the construction site is really starting to take shape.Jun 20, 2006
splash_construction30.jpg
Another shot from the monorail showing slightly further along the car park.

What a mess...!
Jun 20, 2006
splash_construction29.jpg
The presence of the builders is still very much evident from the monorail with all manner of materials and portacabins in the car park.Jun 20, 2006
splash_construction28.jpg
A room with a quarry view, only at Alton Towers' Splash Landings Hotel...Jun 20, 2006
splash_construction27.jpg
Guests are having to use the stairs due to the non-functioning lifts, whilst doing so they're met by ladders and unfinished wallpapering hanging from the walls.Jun 20, 2006
splash_construction26.jpg
Towers, wallpaper, paint, rollers, adhesive and brushes lie on a window without a sill, and some rather filthy glass. Looks very unsightly.Jun 20, 2006
splash_construction25.jpg
Bits of rubbish and pots of paint/paste/etc. lie in corners around the hotel. Not particularly dangerous but looks terrible for a £220/night hotel.Jun 20, 2006
splash_construction24.jpg
The lifts haven't been completed yet so guests are having to use the stairs (more on those later) - it seems they've used a little initiative here and placed barriers to stop guests falling down open lift shafts.Jun 20, 2006
splash_construction23.jpg
Here and in many places around the hotel you'll find trailing cables and tools lying around.Jun 20, 2006
splash_construction22.jpg
More wet paint on the doors to the games arcade (which is no doubt another way to extract as much money from guests as possible).Jun 20, 2006
splash_construction21.jpg
Scaffolding poles lie on the floor just inside the entrance to the restaurant. Just a small trip hazard...Jun 20, 2006
splash_construction20.jpg
As the signs state, the paint on the restaurant entrance desk is wet. 2 weeks bad weather stopped this being painted on time did it?Jun 20, 2006
splash_construction19.jpg
Heading down a set of steps and more tools, bits of equipment, materials and paint are lying about on the floor.Jun 20, 2006
splash_construction18.jpg
The outdoors section of the Cariba Creek waterpark, clearly a LOT of work to be done before this is anywhere near ready!Jun 20, 2006
splash_construction17.jpg
Work continues elsewhere in Cariba Creek waterpark.Jun 20, 2006
splash_construction16.jpg
Scaffolding and building materials still surround parts of the Master Blaster. Various debris lies on the roof of the ride.Jun 20, 2006
splash_construction15.jpg
Tools, equipment and materials sit in the channel of the Master Blaster water rollercoaster.Jun 20, 2006
splash_construction14.jpg
A worker sticks tape on faults whilst walking the route of the unfinished Master Blaster water rollercoaster, the star attraction of Cariba Creek.Jun 20, 2006
splash_construction13.jpg
Large windows in the hotel foyer area give you an excellent view of the unfinished Cariba Creek waterpark, with only 1 pool containing water and one water feature working (shown).Jun 20, 2006
splash_construction12.jpg
The first thing I noticed once I walked into to hotel was the ladder and tins of paint in the foyer area, work on the ceiling wasn't finished.Jun 20, 2006
splash_construction11.jpg
A number of holes like this can be found around the entrance area. They aren't fenced off and I imagine could prove dangerous to any young children about.Jun 20, 2006
splash_construction10.jpg
Water should be running down this focal water feature located in front of the entrance. Instead trailing wires run to it, black polythene, tools and parts lie around it.Jun 20, 2006
splash_construction09.jpg
Various structures around the hotel are yet to be completed and more unfinished paving.Jun 20, 2006
splash_construction08.jpg
Large areas of paving to the right of the entrance are not yet completed.Jun 20, 2006
splash_construction07.jpg
On the left of the hotel entrance plastic sheeting obscures work taking place on the outdoor seating for the bars and restaurants.Jun 20, 2006
splash_construction05.jpg
Just around the corner and a large amount of exterior work on the hotel is awaiting completion. Does the place look like it should be open to you?Jun 20, 2006
splash_construction06.jpg
Even the entrance area to the Splash Landings Hotel hasn't been completed on time. It's not like first impressions count or anything...Jun 20, 2006
splash_construction03.jpg
A closer look at all the building materials lying around in the previous shot. This type of scene is typical around the hotel's exterior.Jun 20, 2006
splash_construction04.jpg
Scaffolding around one of the water flumes, the new connecting walkway just behind. If you're wondering, the patch on the flume says 'Diversion' with an arrow pointing up the flume.Jun 20, 2006
splash_construction01.jpg
The sign on the hotel roundabout which indicates the Splash Landings drive, complete, illuminated, nice. So far, so good...Jun 20, 2006
splash_construction02.jpg
From The Alton Towers Hotel car park an open gate revealed something resembling a building site, scaffolding surrounding parts of the new Splash Landings Hotel.Jun 20, 2006
xsector07.jpg
Jun 19, 2006
aaa_nemesis_25.jpg
The final corkscrew and the "Mushroom Cloud Luxury Tours" bus.Jun 19, 2006
aaa_nemesis_06b.jpg
The Nemesis lift hill gives a nice view on the ride circuit, as well as Air in the distance.Jun 19, 2006
aaa_nemesis_05b.jpg
Looking back at the start of Nemesis' lift hill.Jun 19, 2006
air13.jpg
Jun 18, 2006
air12.jpg
Jun 18, 2006
nemesis28.jpg
Jun 18, 2006
nemesis27.jpg
Jun 18, 2006
nemesis25.jpg
Jun 18, 2006
nemesis26.jpg
Jun 18, 2006
ripsaw05.jpg
Jun 18, 2006
nemesis24.jpg
Jun 18, 2006
nemesis23.jpg
Jun 18, 2006
nemesis22.jpg
Jun 18, 2006
nemesis21.jpg
Jun 18, 2006
nemesis20.jpg
Jun 18, 2006
nemesis19.jpg
Jun 18, 2006
nemesis18.jpg
Jun 18, 2006
nemesis17.jpg
Jun 18, 2006
ripsaw04.jpg
Jun 18, 2006
drivingcon060616_03.jpg
Some bendy traffic cones also in storage.Jun 17, 2006
drivingcon060616_01.jpg
Looking towards the archway into Fountain Square, past the steel structure that appeared a week or so ago.Jun 17, 2006
drivingcon060616_02.jpg
A mini Peugeot 207 in storage.Jun 17, 2006
aircon020125_05.jpg
The view from the platform next to the shop.Jun 17, 2006
aircon020125_04.jpg
More landscaping has been carried out around the first drop area.Jun 17, 2006
aircon020125_03.jpg
Looking down the brake run, past the maintenance garage on the left.Jun 17, 2006
aircon020125_02.jpg
The shop structure above the station is now largely complete.Jun 17, 2006
aircon020125_01.jpg
Some more landscaping work has been done, and the queue line bridge over the brake run has been erected.Jun 17, 2006
aircon011214_07.jpg
Inside the second station, looking back down towards the brake run.Jun 17, 2006
aircon011214_05.jpg
The view of Air from Ripsaw - you can see the shop above the station is looking much more complete now.Jun 17, 2006
aircon011214_06.jpg
Back in the middle of the ride circuit, looking towards the station/shop.Jun 17, 2006
aircon011214_03.jpg
Standing by the exit of the second tunnel, looking towards the final parts of the ride.Jun 17, 2006
aircon011214_04.jpg
Up on the hill, looking towards the station.Jun 17, 2006
aircon011214_02.jpg
The second tunnel now has a walkway above it.Jun 17, 2006
aircon011214_01.jpg
The final helix next to the car park, and the last turn of the ride in the foreground.Jun 17, 2006
aircon011019_06.jpg
The station is really starting to come together now, with the viewing platform having been constructed.Jun 17, 2006
aircon011019_05.jpg
Another look at the second tunnel from a different angle.Jun 17, 2006
aircon011019_04.jpg
Looking towards the exit of the second tunnel, from the station.Jun 17, 2006
aircon011019_03.jpg
The drop after the first inversion, where you'll be lying on your back.Jun 17, 2006
aircon011019_02.jpg
Looking down the drop into what will become the second tunnel.Jun 17, 2006
aircon011019_01.jpg
The final inversion, a barrel roll, has now been constructed.Jun 17, 2006
winter0405_10.jpg
The Black Hole tent, with the snow giving it a nice look.Jun 15, 2006
drivingcon060611_02.jpg
Brick paving surrounding this section of the circuit have been removed for the time being.Jun 14, 2006
drivingcon060611_10.jpg
If you compare this shot to the identical one taken on April 19th, you can see just how much has changed since then.Jun 14, 2006
drivingcon060611_09.jpg
A full view of the newly-repainted Gingerbread House.Jun 14, 2006
drivingcon060611_08.jpg
Another look at the structure that appeared recently.Jun 14, 2006
drivingcon060611_07.jpg
Looking from the Vintage Cars area towards where the Cred Street Carousel used to be.Jun 14, 2006
drivingcon060611_06.jpg
Some of the old Vintage Cars theming is still in place, awaiting removal.Jun 14, 2006
drivingcon060611_05.jpg
Not much has changed at this end of the circuit.Jun 14, 2006
drivingcon060611_04.jpg
To the left of this photo you can see what looks like a roundabout.Jun 14, 2006
drivingcon060611_03.jpg
The rest of the old Gingerbread House has been painted blue now, and the facade to the left of the photo is also looking much more vibrant.Jun 14, 2006
drivingcon060611_01.jpg
The last sections of the circuit have now got kerbs, and are nearly ready for the tarmac to be poured.Jun 14, 2006
drivingcon060419_01.jpg
From the top of the Towers, looking towards the fenced-off section of Cred Street.Jun 14, 2006
forbiddenvalley09.jpg
Jun 10, 2006
drivingcon060608_05.jpg
This could possibly be the "pits" area for storing unused cars.Jun 09, 2006
drivingcon060608_04.jpg
This could be a starting light gantry, or perhaps just a small bridge.Jun 09, 2006
drivingcon060608_03.jpg
A new structure has appeared over part of the track. Note also that the previously-yellow wall behind it has been repainted white.Jun 09, 2006
drivingcon060608_02.jpg
Part of the Gingerbread House has been repainted blue, we assume the rest will follow.Jun 09, 2006
drivingcon060608_01.jpg
More parts of the circuit have been poured.Jun 09, 2006
logflume08.jpg
A sign requesting that riders don't splash.Jun 09, 2006
night_air12.jpg
Jun 09, 2006
air11.jpg
Jun 09, 2006
air10.jpg
Jun 09, 2006
worldcup2006_02.jpg
More of the new flags by the Towers Street entrance.Jun 08, 2006
worldcup2006_01.jpg
These flags have temporarily replaced the standard ones in the entrance plaza.Jun 08, 2006
ritacon050226_02.jpg
Looking through the famous corkscrews, at the new backdrop of Rita.Jun 06, 2006
missaltontowers2006_01.jpg
The girls all gather round for a group photo, with Alana Cunningham having been crowned Miss Alton Towers 2006.Jun 04, 2006
aaa_nemesis_15.jpg
A train in the station, viewed from the brake run.Jun 03, 2006
submission10.jpg
May 29, 2006
submission09.jpg
May 29, 2006
submission07.jpg
May 29, 2006
submission08.jpg
May 29, 2006
drivingcon060528_14.jpg
More tarmac has been poured, as you can see to the right of this photo.May 29, 2006
drivingcon060528_13.jpg
Looking across the site. There's evidently lots of work still to do.May 29, 2006
drivingcon060528_12.jpg
A close look to where the road heads into the "tunnel", formerly the gingerbread house. The arch on the right has been heightened to match the door on the left.May 29, 2006
drivingcon060528_11.jpg
It's very likely that these trees will stay in place, hence the barriers.May 29, 2006
drivingcon060528_09.jpg
This section of tarmac was poured several weeks ago.May 29, 2006
drivingcon060528_10.jpg
No theming has yet been added to this island.May 29, 2006
drivingcon060528_08.jpg
Around the back, we take a closer look at the newer parts of the circuit.May 29, 2006
drivingcon060528_07.jpg
The steamroller sits motionless on the far side of the construction site.May 29, 2006
drivingcon060528_06.jpg
You can see that more kerbs have been put in place, outlining the circuit.May 29, 2006
drivingcon060528_05.jpg
The showroom interior is looking a lot tidier now, though.May 29, 2006
drivingcon060528_04.jpg
Inside, little has changed in the last few weeks.May 29, 2006
drivingcon060528_03.jpg
A lone workman touches up the front of what will become the "car showroom" building.May 29, 2006
drivingcon060528_01.jpg
More work has been done in the area next to the archway that joins Fountain Square to Cred Street.May 29, 2006
drivingcon060528_02.jpg
Not much activity on-site today: the contractors are usually only brought in on weekdays.May 29, 2006
ccfcon060124_12.jpg
The old "Party Room", which will not be seen by guests - the boats will pass through en route from the Offload area to the main station.May 24, 2006
ccfcon060124_11.jpg
You can see that there is still a fair bit of work to be done in here.May 24, 2006
ccfcon060124_10.jpg
Looking through into the Chocolate Room.May 24, 2006
ccfcon060124_09.jpg
Can you recognise this section? It's where the queue line used to come down on the other side of the station to the entrance, and guests would stand on the floor here prior to boarding. It is now covered up.May 24, 2006
ccfcon060124_08.jpg
From the same spot, you can see that the old "Party Room" has been left undecorated. Again, guests will never see this section any more so there is no need to theme it.May 24, 2006
ccfcon060124_06.jpg
Turning to the right, you can see a piece of Toyland theming to the right which has not been removed - no need, as the public will never see this area.May 24, 2006
ccfcon060124_07.jpg
Inside the station, access to the first turn of the ride is still covered up.May 24, 2006
ccfcon060124_05.jpg
Inside, we take a look up the old exit path. This will now only be used for staff access.May 24, 2006
ccfcon060124_04.jpg
Looking at the main part of the fascia - you can see framework is in place to hold the ride's logo.May 24, 2006
ccfcon060124_02.jpg
Looking up at the faux chimney that forms part of the fascia.May 24, 2006
ccfcon060124_03.jpg
The new frontage has yet to be decorated.May 24, 2006
ccfcon060120_15.jpg
From the front of the station looking back. You can see that the staircase that used to form part of the queue line has now been covered up.May 24, 2006
ccfcon060120_14.jpg
Inside the station, you can see that access to the rest of the ride has been restricted.May 24, 2006
ccfcon060120_13.jpg
Another part of the Juicing Room.May 24, 2006
4925 images on 25 page(s) Spacer Spacer Spacer 9Spacer Spacer
Spacer