ATAGalleryConstructionRita - Queen of Speed › March 21st 2005
ritacon050321_01.jpg
Ever more testing going on. With 4 days left until the first guests are due to ride Rita, it hasn't even had a single person go around the track yet!
ritacon050321_02.jpg
Ug Swinger's new operator cabin is under construction. Up until this year, the operator has sat in the centre of the ride.
ritacon050321_03.jpg
An empty train flies overhead during testing.
ritacon050321_04.jpg
A look underneath the station, with Train 1 above.
ritacon050321_05.jpg
The loading bay railings in the Corkscrew station are being repainted a bold red, matching Rita's track colour.
ritacon050321_06.jpg
On the other half of the station, you can see the original red railing colour underneath the brown coating.
   