More progress has been made since our last update.
|
|
Traffic lights have appeared all around the circuit.
|
|
The bridge connecting the lower end of Cred Street with Fountain Square is now complete. Note also the pole which will be part of the zebra crossing.
|
|
Speed limit signs next to the bubble wash, which has a tortoise motif on it.
|
|
Inside what used to be the Sweet Shop, you can see the decor includes more signs. This is likely to be where kids will get their briefing before heading out onto the circuit.
|
|
A closer look at the sign at the far end of the site, and the bubble wash.
|
|
Another look at the direction signs.
|
|
Looking over to the old Gingerbread house, you can see the "CrowNav" under construction.
|
|
Next to the CrowNav, you can see what will be a "foam wash".
|
|
A close-up on the incomplete CrowNav.
|
|
Mirroring similar shots taken in the last few months, here's another look at the construction site from the top of the Towers.
|
|
|
|